Changelog
Every improvement, feature, and refinement we ship. Building in public since January 2026.
105+
Commits
26
Updates
9
Milestones
v2.4.0
Latest
March 29, 2026
Services Experience Overhaul
Redesigned service cards
3 commitsRemoved hover expand/collapse pattern that caused layout jumps. All service content (scenarios, includes) is now always visible. Each card animates individually on scroll.
Smooth cross-page navigation
2 commitsTapping service links from the First Time Here page now scrolls to the correct section on Services with a smooth transition instead of jumping to the bottom.
Typography consistency pass
1 commitNormalized hero subtitle sizing across all pages. Standardized to text-lg for consistent visual rhythm.
Global spacing tightened
2 commitsReduced section spacing across all tiers for a more editorial, tighter feel. Normalized padding between every page for full consistency.
March 28, 2026
Content Overhaul
Qlip-inspired site rewrite
7 commitsComplete content overhaul inspired by award-winning agency qlip.co.jp. New pages: First Time Here (/start) and How We Work (/process). Rewritten services page with problem-first framing, FAQ, and transparent pricing. Updated About page with real founder story.
March 8, 2026
Portal & Rebrand
Client portal rebuilt
4 commitsThree-sprint rebuild of the stakeholder portal. New dashboard, project detail views, and authentication flow. Integrated with Linear for real project data and Supabase for cookie-based auth.
Craefto Lab → Craefto
1 commitRenamed the business across all pages. Cleaner, sharper, no "Lab" suffix.
March 7, 2026
New journal article
1 commitPublished "Why Nvidia Stepped Back from OpenAI and Anthropic" with custom stats cards, stock tickers, and pull quotes.
March 1–2, 2026
Portal Launch
Stakeholder portal goes live
18 commitsSix sprints shipped in rapid succession: auth hardening with RLS and RBAC, rich text editor, file uploads, data visualization, client experience features (requests, documents, payments, approvals), and growth tools (case study integration, PWA, LinkedIn). Deployed to project-portal.craefto.com.
February 26, 2026
UI polish
3 commitsUpdated service button hover animations, removed cookie consent popup for cleaner first impression.
February 16, 2026
Security patch
1 commitUpdated next-mdx-remote to v6 to address a security vulnerability in the MDX rendering pipeline.
Team update
1 commitAdded Sara's LinkedIn profile to the team section.
February 9–11, 2026
Brand Refresh
Logo v2
3 commitsUpdated the Craefto logo to a refined second version. New favicon across all platforms with cache-busting deployment.
Journal experience improved
5 commitsIntelligent article recommendations that prioritize same-pillar content. Cleaner author cards with centered avatars. Removed emojis and personal names from article cards for a more professional feel.
February 3–4, 2026
SEO and meta overhaul
4 commitsCanonical URLs updated to www.craefto.com across all pages. Fixed OG meta tags for journal articles. Added yellow highlight component for article emphasis.
January 29, 2026
Mobile refinements
1 commitHidden border line above stats on mobile for cleaner layout. Tightened content-to-CTA spacing.
January 15, 2026
Case Studies Launch
Real project imagery
10 commitsAdded real images for TACTIX, NUU, Fontkin, and GlobFam case studies. All compressed with 92% quality for fast loading. Interactive logo component for GlobFam.
Services bento grid
3 commitsRedesigned the services page with a bento grid layout. Tighter spacing between sections for a more editorial flow.
Editorial typography
3 commitsOverhauled the article reading experience with refined editorial typography. Removed drop caps, cleaned up em dashes from copy.
January 14, 2026
Journal & Content Engine
AI-powered content engine
3 commitsLaunched the journal with MDX-based articles, pillar categories (Engineering, Design, Product), and automated content generation pipeline. Full Journal page redesign.
Mobile optimization
3 commitsPerformance pass across all pages. Optimized images, improved responsive layouts, fixed favicon display for Firefox and Safari.
January 12–13, 2026
Admin intelligence dashboard
3 commitsAdded CRM admin dashboard with lead management, analytics, and AI-powered intelligence features for tracking business growth.
Approach section elevated
3 commitsRedesigned the home page Approach & Process section with award-winning 2026 animation patterns. Streamlined for single viewport impact.
January 9–10, 2026
3D Hero Launch
Morphing metaballs hero
14 commitsAdded a 3D morphing metaballs animation to the hero section. Dynamic text color inversion based on metaball overlap. Mobile-responsive with mathematical position tracking. Sage green accent color integration.
Design system foundations
4 commitsSimplified Section and Container components. Established the component architecture that powers every page. Improved content structure based on Awwwards research.
January 9, 2026
Initial Launch
Craefto.com goes live
2 commitsComplete landing page with case studies, services, process, and contact sections. Built with Next.js 15, Tailwind CSS, Framer Motion, and the Paper & Ink design system. "Built to compound."
Want to see what we can build for you?
Every line in this changelog is proof of how we work: iterative, precise, and always improving.